Battery Management System

Project: June 2016 – March 2017 (10 months)

Description

The customer was developing an auxiliary energy storage (lithium ion battery) for FMA support (freewheel engine-off), start/stop operation and emergency support. My main tasks in the project were code reviews (based on checklists and coding rules), static code analysis (MISRA-C:2012 with QAC, Polyspace CodeProver, PC-lint), code quality measurements (HIS metrics with QAC and Polyspace BugFinder), justification of deviations, as well as issue analysis (problem reports on system level).

Summary

Project Battery Management System
Duration June 2016 – March 2017 (10 months)
Customer confidential due to nondisclosure agreement
Industry Sector Automotive
Role / Responsibility Concept Design, Software Design, Unit Tests (C1 Coverage), Code Reviews, Static Code Analysis, Issue Analysis
Software / Tools / Methods IBM Rational DOORS (IBM), STAGES Process Management (methodpark), Redmine Project Management (open source), Enterprise Architect (Sparx), QA-C/MISRA (PRQA), PC-lint (MISRA-C), Polyspace (MathWorks), Tessy (Hitex)
Hardware Environment Freescale MPC5606B (Bolero), ASIC Atic157 (proprietary)

Schreibe einen Kommentar